Client
Bethell
Location
Croston, Leyland
Services
Civil
Sector

Infrastructure

Kennedy Redford supported Bethell Construction with the design development for the delivery of the Grape Lane attenuation tank by providing technical review and engineering consultancy services of the culvert designs.

The hydraulic designs were developed by United Utilities as part of the Wastewater Grape Lane sewer serviceability project.

Kennedy Redford provided technical advice by developing detailed design to support the construction stage of the project and ensuring the suitability of the proposed elements for the lifetime of the infrastructure.

The project will deliver surcharge and at times, flooding relief to the local sewers, ensuring a greater quality of service delivery by United Utilities to the benefit the local community.

We offer a range of services across various sectors, covering all stages of the project lifecycle. From feasibility and pre-concept to operations and maintenance.